The Hiram M. Chittenden Locks, or Ballard Locks, is a complex of locks at the west end of Salmon Bay, in Seattle, Washington's Lake Washington Ship Canal, between the neighborhoods of Ballard to the north and Magnolia to the south.

The Ballard Locks carry more boat traffic than any other lock in the US, and the Locks, along with the fish ladder and the surrounding Carl S. English, Jr., Botanical Gardens attract more than one million visitors annually, making it one of Seattle's top tourist attractions. The construction of the locks profoundly reshaped the topography of Seattle and the surrounding area, lowering the water level of Lake Washington and Lake Union by 8.8 feet (2.7 m), adding miles of new waterfront land, reversing the flow of rivers, and leaving piers in the eastern half of Salmon Bay high and dry. The Locks are listed on the National Register of Historic Places and the American Society of Civil Engineers Historic Civil Engineering Landmarks.

Another scammer. Keep our locksmith trade secure!! | Yelp
www.yelp.com



Prior to construction

As early as 1854, there was discussion of building a navigable connection between Lake Washington and Puget Sound for the purpose of transporting logs, milled lumber, and fishing vessels. Thirteen years later, the United States Navy endorsed a canal project, which included a plan for building a naval shipyard on Lake Washington. In 1891 the U.S. Army Corps of Engineers started planning the project. Some preliminary work was begun in 1906, and work began in earnest five years later under the command of Hiram M. Chittenden. The delays in canal planning and construction resulted in the US Navy building the Puget Sound Naval Shipyard in Bremerton, Washington, which is located across the Sound from Seattle.

Salt Lake City Locksmith Video




Construction

In early 1909, the Washington State Legislature appropriated $250,000, placed under the control of the Corps of Engineers, for excavation of the canal between Lake Union and Lake Washington. In June 1910, the US Congress gave its approval for the lock, on the condition that the rest of the canals along the route be paid for locally. Construction was then delayed by legal challenges, mainly by mill owners in Ballard who feared property damage and loss of waterfront in Salmon Bay, and by Lake Washington property owners.

Under Major James. B. Cavanaugh, Chittenden's replacement as Seattle District Commander, construction of the Ballard, or Government, Locks connecting Salmon Bay to Shilshole Bay began in 1911, proceeding without further controversy or legal entanglements. In July 1912, the Locks gates were closed for the first time, turning Salmon Bay from saltwater to freshwater. The first ship passed through the Locks on August 3, 1916. On August 25, 1916, the temporary dam at Montlake was breached. During the following three months, Lake Washington drained, lowering the water level by 8.8 ft (2.7 m) and drying up more than 1,000 acres (400 ha) of wetlands, as well as drying up the Black River and cutting off the Cedar River salmon run. The Locks officially opened for boat traffic on May 8, 1917. The total cost of the project to that point was $3.5 million, with $2.5 million having come from the Federal government and the rest from local governments.

To allow for the intended boat traffic, three bridges were removed along the ship canal route, at Latona Avenue, Fremont, Stone Way. The Ballard and Fremont Bridges were completed in 1917, followed by the University Bridge in 1919, and Montlake Bridge in 1925. The University Bridge was improved in 1932, and in 1934 the Lake Washington Ship Canal project was declared complete.

Salt Lake City - Taylorsville City Locksmith Service
www.utahlocksmith.net


Function

The locks and associated facilities serve three purposes:

  • To maintain the water level of the fresh water Lake Washington and Lake Union at 20-22 feet (6.1-6.7 m) above sea level, or more specifically, 20.6 ft (6.3 m) above Puget Sound's mean low tide.
  • To prevent the mixing of sea water from Puget Sound with the fresh water of the lakes (saltwater intrusion).
  • To move boats from the water level of the lakes to the water level of Puget Sound, and vice versa.

The complex includes two locks, 30 ft × 150 ft (9.1 m × 45.7 m) (small) and 80 ft × 825 ft (24 m × 251 m) (large). The complex also includes a 235 ft (72 m) spillway with six 32 ft × 12 ft (9.8 m × 3.7 m) gates to assist in water-level control. A fish ladder is integrated into the locks for migration of anadromous fish, notably salmon.

The grounds feature a visitors center, as well as the Carl S. English, Jr., Botanical Gardens.

Operated by the US Army Corps of Engineers, the locks were formally opened on July 4, 1917, although the first ship passed on August 3, 1916. They were named after US Army Major Hiram M. Chittenden, the Seattle District Engineer for the Corps of Engineers from April 1906 to September 1908. They were added to the National Register of Historic Places in 1978.

Vessels passing from the freshwater Lakes Washington and Union to Puget Sound enter the lock chamber through the open upper gates (A in the accompanying diagram). The lower gates (B) and the draining valve (D) are closed. The vessel is assisted by the lockwall attendants who assure it is tied down and ready for the chamber to be drained.

Next, the upper gates (A) and the filling valve (C) are closed and the draining valve (D) is opened allowing water to drain via gravity out to Puget Sound.

When the water pressure is equal on both sides of the gate, the lower gates (B) are opened, allowing the vessels to leave the lock chamber.

The process is reversed for upstream locking.

Locksmith Salt Lake City UT (801) 819-1031 Mr. Locksmith ...
ifoundithere.com


Locks

The complex includes two locks. Using the small lock when boat traffic is low conserves fresh water during summer, when the lakes receive less inflow. Having two locks also allows one of the locks to be drained for maintenance without blocking all boat traffic. The large lock is drained for approximately 2-weeks, usually in November, and the small lock is drained for about the same period, usually in March.

The locks can elevate a 760-by-80-foot (232 m × 24 m) vessel 26 ft (7.9 m), from the level of Puget Sound at a very low tide to the level of freshwater Salmon Bay, in 10-15 minutes. The locks handle both pleasure boats and commercial vessels, ranging from kayaks to fishing boats returning from the Bering Sea to cargo ships. Over 1 million tons of cargo, fuel, building materials, and seafood products pass through the locks each year.

Salt Lake City - Locksmith Service Salt Lake City, Utah ...
www.utahlocksmith.net


Spillway

South of the small lock is a spillway dam with tainter gates used to regulate the freshwater levels of the ship canal and lakes. The gates on the dam release or store water to maintain the lake within a 2 ft (0.61 m) range of 20 to 22 ft (6.1 to 6.7 m) above sea level. Maintaining this lake level is necessary for floating bridges, mooring facilities, and vessel clearances under bridges.

"Smolt flumes" in the spillway help young salmon to pass safely downstream. Higher water levels are maintained in the summer to accommodate recreation as well as to allow the lakes to act as a water storage basin in anticipation of drought conditions.

Photos for Action Locksmith | Yelp
www.yelp.com


Salt water barrier

If excessive salt water were allowed to migrate into Salmon Bay, the salt could eventually damage the freshwater ecosystem. To prevent this, a basin was dredged just above (east of) the large lock. The heavier salt water settles into the basin and drains through a pipe discharging downstream of the locks area. In 1975, the saltwater drain was modified to divert some salt water from the basin to the fish ladder, where it is added via a diffuser to the fish ladder attraction water; see below.

To further restrict saltwater intrusion, in 1966, a hinged barrier was installed just upstream of the large lock. This hollow metal barrier is filled with air to remain in the upright position, blocking the heavier salt water. When necessary to accommodate deep-draft vessels, the barrier is flooded and sinks to the bottom of the chamber.

Locksmith Salt Lake City UT (801) 819-1031 Mr. Locksmith ...
ifoundithere.com


Fish ladder

The fish ladder at the Chittenden locks is unusual--materials published by the federal government say "unique"--in being located where salt and fresh water meet. Normally, fish ladders are located entirely within fresh water.

Pacific salmon are anadromous; they hatch in lakes, rivers, and streams--or, nowadays fish hatcheries--migrate to sea, and only at the end of their life return to fresh water to spawn. When the Corps of Engineers first built the locks and dam, they changed the natural drainage route of Lake Washington. The locks and dam blocked all salmon runs out of the Cedar River watershed. To correct this problem, the Corps built a fish ladder as the locks were constructed to allow salmon to pass around the locks and dam.

The ladder was designed to use attraction water: fresh water flowing swiftly out the bottom of the fish ladder, in the direction opposite which anadromous fish migrate at the end of their lives. However, the attraction water from this first ladder was not effective. Instead, most salmon used the locks. This made them an easy target for predators; also, many were injured by hitting the walls and gates of the locks, or by hitting boat propellers.

The Corps rebuilt the fish ladder in 1976 by increasing the flow of attraction water and adding more weirs: most weirs are now one foot higher than the previous one. The old fish ladder had only 10 "steps"; the new one has 21. A diffuser well mixes salt water gradually into the last 10 weirs. As a part of the rebuilding, the Corps also added an underground chamber with a viewing gallery.

The fish approaching the ladder smell the attraction water, recognizing the scent of Lake Washington and its tributaries. They enter the ladder, and either jump over each of the 21 weirs or swim though tunnel-like openings. They exit the ladder into the fresh water of Salmon Bay. They continue following the waterway to the lake, river, or stream where they were born. Once there, the females lay eggs, which the males fertilize. Most salmon die shortly after spawning.

The offspring remain in the fresh water until they are ready to migrate to the ocean as smolts. In a few years, the surviving adults return, climb the fish ladder, and reach their spawning ground to continue the life cycle. Of the millions of young fish born, only a relative few survive to adulthood. Causes of death include natural predators, commercial and sport fishing, disease, low stream flows, poor water quality, flooding, and concentrated developments along streams and lakes.

Visitors to the locks can observe the salmon through windows as they progress along their route. Although the viewing area is open year-round, the "peak" viewing time is during spawning season, from about the beginning of July through mid-August. A public art work, commissioned by the Seattle Arts Commission, provides literary interpretation of the experience through recordings of Seattle poet Judith Roche's "Salmon Suite," a sequence of five poems tied to the annual migratory sequence of the fish.

Migratory fish

Among the species of salmonids migrating routinely through the ladder at the Chittenden Locks are Chinook (king) salmon (Oncorhynchus tshawytscha), Coho (silver) salmon (Oncorhynchus kisutch), Sockeye (red) salmon (Oncorhynchus nerka), and steelhead (Oncorhynchus mykiss).

Seattle salmon-run viewing schedule at the Seattle Fish Ladder. Sockeye - June, July; Chinook and Coho - Sept, Oct; steelhead - late fall and winter

Locksmith Salt Lake City UT (801) 819-1031 Mr. Locksmith ...
ifoundithere.com


Notes



Are You Looking for Products

Here some products related to "Hiram M. Chittenden Locks".

Amazon.com : Blackburn Voyager Click Headlight and Mars Click Tail ...
Amazon.com : Blackburn Vo..
Amazon.com : Blackburn Voyager Click Headlight and Mars Click Tail ...
Amazon.com : Blackburn Vo..
Amazon.com: Swissmar KF-77073 Swivel 8 Person Raclette Party Grill ...
Swissmar KF-77073 Swivel ..
Amazon.com: Swissmar KF-77073 Swivel 8 Person Raclette Party Grill ...
Swissmar KF-77073 Swivel ..

Get these at Amazon.com

* amzn.to is official short URL for Amazon.com, provided by Bitly

Source of the article : here





EmoticonEmoticon

 

Start typing and press Enter to search